If you want to run and deliver reports on a daily basis, select “Daily/Interval”.

| Batch Name | Specify name for the Schedule | 
| Description | Description for the schedule. | 
| Schedule Pattern | Choose time intervals at which the schedule is to be run, in this case ‘Daily/Interval’. | 
| Schedule Frequency | |
| Every ____ Day | Specify number of day’s interval between each time the schedule is run. | 
| Start Date | Start date for scheduled task. | 
| End Date | End date for the schedule if required, else “No end date”. | 
| Schedule Time | |
| Occurs at | Specify what time the schedule is to be run. | 
| Occurs every | Specify at what hour intervals the schedule (for example, every 8 hours) is to be run with the option to stipulate the time range during which it is to be run. | 
<< Assign Schedule Name and Define schedule frequency | Weekly Report Delivery >>